Domains of Activities
News
Ariane 6 Takes Off Again on a Successful First Commercial Flight
slug
Space
Defence
Transport
Public Sector
May 11, 2026
+
All posts
Press Release
Event
Publication
Innovation
July 1, 2025
GTD contributes to the SALTO project with advanced on-board and ground systems, including GAFTS and Industry 4.0 demonstrators, supporting Themis—the first European reusable rocket stage.
April 3, 2025
GTD’s Launch Control System ensured safe countdown and flight termination for Isar Aerospace’s Spectrum test—the first commercial orbital launch attempt in Europe.
March 27, 2025
GTD has sponsored the Hypatia II mission, an analog Mars mission conducted in February 2025 at the Mars Desert Research Station (MDRS) in Utah, USA.
March 26, 2025
GTD leads deployment of ice storage at Guiana Space Centre, cutting cooling energy use by 22% and slashing CO₂ emissions via off-peak renewable power.
On March 6, 2025, Ariane 6’s first commercial mission deployed the CSO-3 satellite—powered by GTD’s mission-critical software and on-site expertise for flawless launch.
July 10, 2024
Ariane 6’s maiden flight from French Guiana deployed satellites—powered by GTD’s mission-critical software as Europe ramps up to 14 launches/year.
May 21, 2024
GTD wins ESO contract to deliver a fully automated monitor & control system for the 3.6 m Coating Plant at La Silla Observatory—boosting telescope performance and efficiency.
May 15, 2024
Introducing GTD’s patented “Cold Storage” energy system—an AI-driven solution that captures low-cost renewable power for efficient, sustainable energy management at CSG’s new Ariane 6 launchpad.
…